Civic Space in Downtown Superior

Share Civic Space in Downtown Superior on Facebook Share Civic Space in Downtown Superior on Twitter Share Civic Space in Downtown Superior on Linkedin Email Civic Space in Downtown Superior link

Feb. 2024 UPDATE: A design has been chosen. Here are two PDFs to view the overall floor plan schematic and a more stylized version of the 1st and 2nd floors.

A new 8,000-square-foot civic space is under construction in Downtown Superior, with completion expected in late 2023 or early 2024. (See the Civic Space Floorplan Layout under "Key Documents" in the right column.) The Civic Space is roughly half the size in square footage of the Superior Community Center.

The 2-story public space includes an entry lobby, restrooms on both levels, an elevator, an interior stairway, and large glass overhead doors on each floor. Space has also been identified for a small warming or catering kitchen and office space for staff to operate the building.

Initial ideas for space usage include a library area, meeting space, studio/classroom space for classes and activities, and event and/or performance space.

The Town is seeking input from the community on potential uses. All ideas are welcome!

This Engagement ended on Sunday, June 25, 2023

Feb. 2024 UPDATE: A design has been chosen. Here are two PDFs to view the overall floor plan schematic and a more stylized version of the 1st and 2nd floors.

A new 8,000-square-foot civic space is under construction in Downtown Superior, with completion expected in late 2023 or early 2024. (See the Civic Space Floorplan Layout under "Key Documents" in the right column.) The Civic Space is roughly half the size in square footage of the Superior Community Center.

The 2-story public space includes an entry lobby, restrooms on both levels, an elevator, an interior stairway, and large glass overhead doors on each floor. Space has also been identified for a small warming or catering kitchen and office space for staff to operate the building.

Initial ideas for space usage include a library area, meeting space, studio/classroom space for classes and activities, and event and/or performance space.

The Town is seeking input from the community on potential uses. All ideas are welcome!

This Engagement ended on Sunday, June 25, 2023

  • CLOSED: This survey has concluded.

    Please help us prioritize the future use of the new 8,000 sq. ft civic space in Downtown Superior.

    ENGAGEMENT ENDED SUNDAY, JUNE 25.

    Share Civic Space Usage Survey on Facebook Share Civic Space Usage Survey on Twitter Share Civic Space Usage Survey on Linkedin Email Civic Space Usage Survey link
Page last updated: 24 Feb 2024, 06:26 PM